Two years have elapsed since project logging was halted. The reason for the halt was a house move
and consequent workshop re-construction, which interfered with everything, in life. The project
itself has stumbled along and progressed considerably, particularly over the Spring of 2015. This
log starts from the current position, without an attempt to provide a coherent development history
of the intervening two years. However, the Module Design section below describes the current
configuration of the railway modules; and it is hoped that this will provide an adequate bridge from
Past writing.
|