This is the top of the tree of manufacturing notes for modules for the NG&DR prototype portable
railway. A set of modules that are constrained by a few, similar, design conventions, can be linked
together to form an arbitrarily configured railway.
The development of the railway has included CAD drawing and design computer software; a lot of
thought was put into this engineering. Naturally, concepts developed in those places have been
inherited by hardware. Any apparently arbitrary design features in the hardware probably are the
result of earlier engineering decisions.
These notes can be read in sequence, which yields a bottom up approach to
manufacturing; and, ultimately, this is what must be done in the workshop. Alternatively, the
notes can be read via the links below, which offer a top down view which may help
with comprehending the structure of what is described. The links for assemblies usually lead to
images, which, also, are very helpful.
|
Construction Hierarcy
Go Back to the Top
|
Tooling
Go Back to Construction Hierarcy
Some jigs and tools have been made, and their existance and use is assumed in these notes. None of
these is of durable industrial strength, so they must be used carefully. However, current
indications are that the jigs and tools that have been made are adequate for the job; and, of
course, they do save a lot of time and minimize silly machining errors.
|
Interface Plate Drilling Jigs
Go Back to Construction Hierarcy
A drilling jig has been made for a locator, and another for positioning locators on a double track
module interface with an arbitrary 10 inch track centreline spacing. When producing a double track
interface, in order to achieve smooth engagement and disengagement, it is important that the four
pin-and-socket locations are as close to co-linear as possible. It is worth paying attention to
this during manufacture.
|
Module Assembly Jig
Go Back to Construction Hierarcy
A jig has been made for the construction of arbitrary modules. Normally, a computer-generated paper
template is used with the jig, as shown in the second image below. This procedure is not necessary,
but a template increases precision and ease of use. The steel angles in the image below are the jig
interface plates and they mate with the new module interface plates. Each jig interface plate
pivots about a pin in the leftmost blue track to align the module ends.
In the railway design computer code, the distance between the end plates along the leftmost blue
track is known as the size vector of the module; and the angle between the plates is
the turn.
|
This image shows a paper template in position on the jig.
|
Socket Liner Tool
Go Back to Construction Hierarcy
This is a tool for pressing the liners into the rib sockets; it is shown in
this rib image.
|
Jigs To Be Made
Go Back to Construction Hierarcy
These jigs do not exist but probably are a good idea.
- Interface Pin Assembly Tool
Probably this is simply a piece of round stock with a hole in the end that accepts a pin, but
keeps the pin poking out. This tool then can be used in a press or vice.
- Platform Templates
When more than a very small number of modules of the same design are to be made, it is
worthwhile to make a durable shape template from the paper template used on the module
assembly jig. The precise nature of such templates is yet to be determined.
|
Basic Tasks
Go Back to Construction Hierarcy
- Interface Blank
Go Back to Construction Hierarcy
This is cut from a 1-1/2 x 1-1/2 x 1/8 aluminium angle. The length for the single track interface
is 6-1/2 inches, for the double track, 16-1/2 inches, the 10 inch difference is the centreline
spacing of the two tracks. The ends of the blank must be square since the module frame sides are
located by this interface.
- Interface Plate Drilling
Go Back to Construction Hierarcy
Place the locator positioning jig on the outside of the blank and drill #13 holes
in the blank, one for the single track interface, three for the double track interface. The
centre hole marks the centre of the long interface, but is not used otherwise in manufacturing.
The other holes are offset 1/4 inch from the centreline of the associated locator, and are used to
position the locator drilling jig. Deburr the holes.
For each locator, i.e., once for a single track interface, twice for a double track interface,
do as follows
- Place the locator drilling jig on the inside of the blank and bolt to the
blank using the centreline marking hole made using the positioning drilling jig.
- Drill five holes in the blank as indicated by the jig. Those on the same face as the bolt
are 1/4 inch (or #E), and #13. The three on the other face are all #19. Deburr the holes.
- Attachment Blocks
Go Back to Construction Hierarcy
These are simple oak blocks that are glued to the ends of an interface plate. When the module
frame is assembled the frame sides are glued to these these blocks, which forms the main frame
perimeter. The blocks are cut from nominal 1 x 2 oak board and are 1-3/8 long; the latter
dimension should make the installed block essentially flush with the top edge of the interface
plate. The faces that are to be glued must not be contaminated with dirt, finger-marks, etc.,
since the glued joints are important for frame strength.
- Attachment Assembly
Go Back to Construction Hierarcy
An interface plate requires an attachment block to be glued flush to each end with epoxy. This
glueing must be done after both interface blank completion and drilling. The corner of the block
installed in the crotch of the interface plate blank should be chamfered if necessary to ensure
good seating. The areas on the interface plate to be glued should be cleaned and roughening with
emery cloth to ensure good glue adhesion. The block should be clamped to both faces of the plate
during epoxy cure.
- Location Pins
Go Back to Construction Hierarcy
These are purchased items that are installed in an interface plate. However, an alternative
design exists for these pins, which would be made in the workshop. These pins have a longer
engagement taper, and a short full engagement diameter, which is thought to be more suitable for
module interface location. Also these alternative pins have an internal thread, and they are
attached to the interface plate with a screw. None of these pins has been made.
- Interface Location Pin Assembly
Go Back to Construction Hierarcy
Each interface plate locator requires a locating pin to be installed into the locator #13 hole. A
multi-locator interface plate requires a locating pin for each locator. Installation must be done
with care to avoid damage to the aluminium by the steel pin. High strength Loctite should be used
on purchased pin installation, low or medium strength Loctite on the alternative pin threads.
- Socket Liner
Go Back to Construction Hierarcy
The socket liner is a piece of tube 1-1/4 diameter x 0.058 wall. The ends must be square, and the
length 1.25 inches. This liner is best finished in a lathe, and an adequate lead-in provided for
a leg.
- Socket Washer
Go Back to Construction Hierarcy
This is a steel washer at the bottom of the socket that spreads the load put on the rib by a leg.
This is a purchased item, being a 1-1/4 diameter fender washer. The centre hole size is not
important; suitable washers may be identified as AJB or AJC, the B/C specifies the centre hole
size.
- Rib Blank
Go Back to Construction Hierarcy
This is cut from a 2 x 2 Pine board. The length for the single track interface
is 6-1/2 inches, for the double track, 16-1/2 inches, the 10 inch difference is the centreline
spacing of the two tracks. The ends of the blank must be square since the module frame sides are
located by this interface.
- Socket Drilling
Go Back to Construction Hierarcy
The leg socket holes are drilled in a rib blank on a drill press using a 1-1/4 inch Forstner bit.
It is necessary to use a carbide-tipped bit. On the prototype modules a standard hardware shop
Forstner bit was used and this was ruined rather quickly by the heat generated by the cut. The
first ribs made were oak; however, even pine, as used later, gets the cutter very hot. The holes
lie on the centreline of the rib and are 1 inch from the end of the rib, which puts them on 4-1/2
or 14-1/2 inches centres according to the width of the module. The socket holes should be square,
and the hole depth must be adequate to ensure the socket liner does not protrude above the rib. A
good target depth is 0.02-0.03 inches greater than the sum of the length of the liner and the
thickness of the load bearing washer
- Frame Sides
Go Back to Construction Hierarcy
Frame sides are stock 1-1/2 x 1/8 aluminium bar. The length obviously varies according to the
module arc length, and less obviously varies with the curvature of the module. The outer side of
a curved main frame is longer than the inside side. This difference can be important when
purchasing the frame side material because a standard length from a supplier is 12 feet, i.e.,
exactly twice the nominal arc length of a standard module. On the prototype double track 71 inch
arc length module, for transportation convenience, the 12 feet long material was cut, by the
supplier, to yield pieces 73 inches long and the remainder. This was acceptable because the
longer side length is about 72-1/4 inches.
The frame sides must be curved using slip rolls, or somesuch, and cut to a precise length,
before installation. However, this is done, more or less, at module assembly time; no basic work
is required.
- Platform
Go Back to Construction Hierarcy
Module platforms are made from 1/4 Baltic birch, and they are conceptually very simple, being just
a shape. The prototype platforms were traced from the module assembly jig paper templates using
carbon paper - an old fashioned technology associated with typewriters for those who have not
heard of it. The prototype platforms then were cut out using a powered jig saw. At the time of
writing it is guessed that the best way to mark the outline of a platform is to create a template;
but this is a development item. It is very useful to mark the primary track centreline on the
platform at each end, small notches were used on the prototypes. These marks assist greatly in
positioning the main frame when it is being prepared to be glued to the platform. Positioning
blocks clamped onto the platform also are hugely useful when the frame finally is offered up to
the platform with the glue in place by helping to avoid smearing the glue.
- Attachment Side Blank
Go Back to Construction Hierarcy
The prototype side blanks are 3 inches wide and the length of the module, as required. The
thickness depends on the material used. The prototypes are of poplar (1/4 inch), Baltic birch
(1/8 inch), and Luan (3/16 inch). It is intended to try 1/8 inch double sided tempered hardboard,
which has been recommended highly by a fellow steamer. These sides are cut from a 4 x 8 sheet.
- Attachment Side Locators
Go Back to Construction Hierarcy
These locators are small pieces of wood that are glued in pairs in three places to the side
blanks, in the middle and at each end. The platform is held in place by, and in between, the
locators during glueing of the sides to the platform edge.
- Leg Tubes
Go Back to Construction Hierarcy
The legs tubes are cut from standard 1-1/8 and 1 inch telescoping tubing with a wall thickness of
0.058 inches. The 1-1/8 tube is 21-1/8 inches long, and the 1 inch tube is 24 inches long. After
cutting, the tubes must be carefully de-burred at each end, thoughly cleaned, and checked for
smooth assembly. The 1-1/8 tube should be roughened with emery cloth at one end in preparation
for glueing to the leg clamp.
- Leg Clamp
Go Back to Construction Hierarcy
The leg clamps are purchased items.
- Leg Clamp Sleeve
Go Back to Construction Hierarcy
The leg clamps are made for 1-1/4 inch diameter tubing. This means that the clamp must be sleeved
with 1-1/4 diameter telescoping tubing in order to accept the 1-1/8 leg tube. The sleeve is 2-1/8
inches long, and must be de-burred and roughened with emery cloth inside and outside in
preparation for glueing.
- Leg Foot
Go Back to Construction Hierarcy
A leg foot comprises two purchased items. These are a standard rubber foot for a 1 inch tube, and
a 1 inch diameter steel fender washer, which spreads the load imposed by the leg tube.
|
Assemblies
Go Back to Construction Hierarcy
- Interface Plates
Go Back to Construction Hierarcy
These are the ends of the main frame of a module. Two are glued to two frame sides to form the
frame perimeter.
Fitting
Go Back to Construction Hierarcy
Multi-track interfaces may not mate nor separate easily due to lack of machining precision. At
the time of writing there is a lack of information to guide best practice. On the prototype
modules some success has been achieved by opening the pin socket holes on the
secondary track locator to 0.257 inches (#F) or even 0.261 (#G). On one module
the socket holes on the primary locator also have been opened up as a (not useful) experiment, but
it is hoped that this can be avoided, by precise hole positioning, because single track locators
work well without this modification.
If the secondary track locator socket is drilled larger than 0.25 inches (#E), then the interface
primary end should be marked PL as in the image.
- Ribs
Go Back to Construction Hierarcy
These are the internal spacers of the main frame of a module. Three are glued to the inside of
the frame perimeter. The ribs also house the leg sockets.
The assembled rib. The separate aluminium item is a tool to press the liners into the sockets;
this is used in a bench vice or other press.
Rib Components
Go Back to Construction Hierarcy
This image shows the rib assembly components: one end of the drilled blank, 1-1/4 od liners, and
1-1/4 diameter fender washers. The washers shown are identified as AJB and are about 0.046 inch
thick; the liners are 1.25 inches long; and the holes are drilled to about 1.31 deep. After
assembly, it is important that the liners do not protrude above the surface of the rib so that the
ribs can lie level with the frame sides during frame assembly. The surfaces to be glued have not
been prepared, by roughening with emery cloth, in this image.
- Main Frame
Go Back to Construction Hierarcy
The main frame is assembled in the Module Assembly Jig from
two Interface Plates, three Ribs, and
two Frame Sides.
A computer model for the module is produced by the computer railway design software. A full-size
- and amazingly accurate! - paper template is produced from this model by a commercial drawing
printer (Staples). This paper template is installed in the jig located by pivots on the jig
interface plates. This template indicates the required angular position of the interface plates,
which then are held in place during construction by blue clamps, two of which can be seen on the
right of the image. The aluminium module interface plates are loaded into the jig.
The frame sides now are curved using slip rolls or other mechanism until they conform to the
template lines. This process is accurate enough that it is possible at this point, i.e., before
assembly, to cut the sides to their finish lengths. After suitable surface preparation, the sides
are glued with epoxy to the interface plates using clamps during cure. These clamps are not shown
in the image since this operation was complete when the image was taken.
The image shows the last operation, where the three wood ribs are being glued in place. Whenever
glueing, or other potentially damaging operation, is being carried out on the template, the
template is protected with waxed paper, some of which can be seen in the image. The leg socket
holes are out of sight since the frame is right side up.
The module shown being assembled was the first double track module to be made; accordingly,
assembly proceeded with caution, one step at a time. The epoxy glue has a cure time of at least
six hours, which became an overnight wait. Clearly there is room for assembly time reduction,
mainly doing all the glueing at once. Using a quick-set glue probably is a bad idea, both because
those varieties are not as strong as the extended cure epoxy, and because the open time is not
adequate to allow careful module assembly. The epoxy used, J-B Weld, has an open time of about 30
minutes, this time also depends on the temperature.
- Attachments
Go Back to Construction Hierarcy
Module configuration clearly is arbitrary; once a main frame and a platform are assembled the
module structure is strong and rigid; finishing is a matter of application requirements. The
prototype modules have sides glued to them to attempt derailing containment; the prototype double
track module has sides that extend above the target rail-head level and below the main frame to
provide some protection if the modules are stacked.
- Module
Go Back to Construction Hierarcy
The main frame is assembled from a Main Frame,
a Platform, and any Attachments that are
desired.
This image shows the first prototype module having plain side attachments glued in place. The
sides are positioned vertically on the platform by the locators glued to the sides. Locators just
can be seen in the image on the right and left sides of the interface plate.
This image shows the first prototype double track module, complete except for its track; the
other prototype modules are to the left. The legs are incomplete.
- Legs
Go Back to Construction Hierarcy
A leg is assembled from Leg Tubes, a Leg Clamp,
a Leg Clamp Sleeve, and a Leg Foot.
The lower, thinner, leg tube carries the rubber foot on one end; the load bearing washer being
inserted into the foot to spread the load from the tube, followed by the tube. It is important
for this tube (actually, all the telescoping tubes) to be clean and burr-free before assembly to
avoid surface damage, and possible jamming.
The upper tube carries the clamp. The sleeve is glued into the appropriate part of the clamp,
followed immediately by the tube being glued into the sleeve. The glue is the epoxy used
throughout module assembly. Any surplus glue on the inside of the tube or clamp must be removed
so that it does not interfere with the lower tube's sliding into the upper tube.
During prototype development there was a significant problem due to the fit between the upper
tube and the clamp being too tight. A different clamp, especially if it were designed for a 1-1/8
diameter tube, would be quite acceptable, or better. But the current clamp was the only one that
could be found despite considerable searching. Most sleeves required hammering (!) to assemble
them in the clamp; the nylon clamps seemed to be able to absorb the hammering and very tight fit,
but it was a disturbing thing to be doing. Turning the outside of the tube and dry-fitting to a
better fit probably is a good procedure.
An assembled leg.
Leg Components
Go Back to Construction Hierarcy
This image shows the components of a leg before glueing and assembly, except that the
load-bearing washer and foot are shown already installed.
- Track
Go Back to Construction Hierarcy
This section has not been written.
|
Go Back to Construction Hierarcy